Latest On Mumbai-Ahmedabad Bullet Train: 70 Daily Rides, 7 Kms Under Sea

Login   |  Register Now

Follow us with

Latest On Mumbai-Ahmedabad Bullet Train: 70 Daily Rides, 7 Kms Under Sea

Posted on : Tuesday 12th of September 2017

Total 1 News Image

NEW DELHI:  Prime Minister Narendra Modi and Japanese Prime Minister Shinzo Abe will on Thursday lay the foundation stone for India's first bullet train project, connecting Mumbai and Ahmedabad, in Ahmedabad, Railway Minister Piyush Goyal said on Monday.

"The commencement of work on the country's first High Speed Rail (Bullet train) project will begin on September 14 in Ahmedabad," Mr Goyal told reporters, adding that the bullet train technology would "revolutionise and transform the transport sector".

"This will be a historical moment as India will gets it first bullet train," he said.

"This is an occasion to celebrate the advent of the most modern technology in India. It shall also benefit the farmers for transportation of agricultural produce in a fast mode," Mr Goyal said.

The Railway Minister said that the high-speed rail was envisioned by PM Modi to take Indian Railways towards "most modern technologies like developed countries".

With the Indian Railways adopting most modern technologies, the bullet train was an endeavour to bring economic growth and prosperity in the country, he said.

The 508-km Mumbai-Ahmedabad High Speed Rail Project will entail an estimated cost of Rs. 1,10,000 crore.

"Out of this Rs. 1,10,000 crore, Japan is giving a loan of Rs. 88,000 crore and the interest on this loan is minimal, i.e. 0.1 per cent," Mr Goyal said.

"This loan is to be repaid to Japan in 50 years. Loan repayment period of 50 years with 15 years grace."

Of the 508-km stretch, 92 per cent of the route will be elevated, six per cent in tunnel and the rest two per cent will be on the ground.

That is, 508 km stretch will have 468 km of elevated track, 27 km inside tunnel and the remaining 13 km on the ground.

The high speed train will also pass through the country's biggest tunnel of 21 km, of which seven km will be under the sea.

Sushant Mishra, Infra Advisor to the Indian Railways, told IANS that Japan was awarded the contract because there had been no accident on its bullet train networks.

"They (Japan) are pioneers of bullet train technology, and their train has the highest punctuality rate," Mr Mishra said.

Japan was also ready to transfer the technology to India and sponsoring the project.

He also said that the works for the terminal in Sabarmati would start from September 14 itself.

"About 825 hectares of land would be acquired for the high speed rail," he said.

On the Ahmedabad-Mumbai route, total 12 stations have been proposed that include Mumbai, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati.

The distance of 508 km will be covered in two hours and seven minutes by the bullet train if it stops at four stations namely Ahmedabad, Vadodara, Surat and Mumbai.

According to railway ministry officials, the operating speed of the bullet train will be 320 kilometers per hour and maximum speed will be 350 kilometers per hour.

If the bullet train will stop at all 12 stations, then it will cover the distance in two hours and fifty-eight minutes.

In a day, the high-speed train will make 70 Ahmedabad-Mumbai sorties.

"A total of 24 high-speed trains will be imported from Japan and then rest of the rakes will be manufactured in India," Mr Mishra said.

Courtesy : NDTV

Disclaimer: The contents or any information provided here is strictly personal and way4indians.com does not hold any responsibility or liability on them. We shall endeavor to upload/publish as many of the comments that are submitted as possible within a reasonable span of time, but we do not guarantee that all comments that are submitted will be uploaded/published. Messages that harass, abuse or threaten other members; have obscene, unlawful, defamatory, libelous, hateful, or otherwise objectionable content; or have spam, commercial or advertising content or links are liable to be removed by the editors. We also reserve the right to edit the comments that do get published. Please do not post any private information unless you want it to be available publicly.

More Articles

His Highness the Amir congratulates Li..

KUWAIT (KUNA) -- His Highness the Amir Sheikh Sabah Al-Ahmad Al-Jaber Al-Sabah sent Friday a cable of congratulations...

Maharashtra Local Group Files Compl..

AURANGABAD:  A local organisation has lodged a police complaint against Malay...

Nirav Modi, Linked To $1.6 Billion ..

NEW YORK:  Celebrity jeweller Nirav Modi, who left India just days before the...

'We Consider Earth Our Mother, Comm..

NEW DELHI:  Prime Minister Narendra Modi today said that India believes in gr...

South African Police Issue Arrest W..

JOHANNESBURG:  South African police on Thursday said they have obtained an ar...

Forced to exist on 'red water', Chhatt..

In Chhattisgarh's Balrampur area, residents are complaining of several health problems due to the dearth of safe ...

'Statue Of Unity' To Be Ready For I..

VADODARA:  The BJP government in Gujarat is aiming to inaugurate the 18-m...

Alert pilot saves lives of 180 Indi..

It was a close shave for 180 passengers of an IndiGo flight at the Birsa Munda air...

PM Modi Visits Shiva Temple In Oman..

MUSCAT:  Prime Minister Narendra Modi today visited a 125-year-old Shiva Temp...

Terrorists attack Army camp in J&K's S..

SRINAGAR: Two Army jawans were on Saturday killed after a group of heavily armed terrorists attacked an Army camp in ...

Mamata Banerjee Is 'Lady Gandhi', S..

KOLKATA:  Hardik Patel, the 24-year-old face of the Patidar campaign in Gujar...

NEET UG 2018 exam on May 6, online sub..

New Delhi: NEET 2018 exam for admission to undergraduate medical and dental courses is all set to be held on May 6, 2...

Advertisements

Copyright © 2012-2018, All rights Reserved   |  www.way4indians.com  |  This Logo is a trademark of Way4Indians. For Enquires, please contact : info@way4indians.com